SMITHWICK RESIDENCE

Revolution Slider Error: You have some jquery.js library include that comes after the revolution files js include.
This includes make eliminates the revolution slider libraries, and make it not work.

To fix it you can:
    1. In the Slider Settings -> Troubleshooting set option: Put JS Includes To Body option to true.
    2. Find the double jquery.js include and remove it.

Product: Corporate W20

Architect: John Harrison Jones, Jeff Edwards, Kenton Keeter, Colin McDoniel, Richard Akin

Contractor: Barnett General Contractors

Millwork: Old City Millwork

Photography: Chad Mellon, Julie Wage Ross

The Smithwick Residence utilized Crittall’s Duralife Corporate W20 series windows and doors to allow an abundance of light to the interior space. The windows and doors are constructed from hot dipped galvanized steel to ensure strength and longevity for years to come. The large floor to ceiling steel windows bring an open, contemporary feel to the floor plan and complement the standing seam roof.

16-18 weeks standard lead time!

Standard lead time for our hot rolled steel products is 16-18 weeks from approved shop drawings. Our competitive lead times depend on product, location, and project size; contact us for more information.

For a Quote and Time Estimate

Contact us today